168Hire
Post a Job Log in
Find Jobs Newsroom Job Safety Pricing

Quantity Surveyor (QS) | Data Center Construction Project

TGW SMART SOLUTION SDN.BHD · 📍 Gelang Patah 振林山, Johor
Full-time construction ✅ Direct contact
Salary8000-10000
Job typeFull-time
Experience5+ years 5 年以上
LocationGelang Patah 振林山, Johor

About the job

Requirements 1. Diploma / Degree in Quantity Surveying, Construction Management, Civil / Electrical Engineering. Registered PQS with BQSM is an advantage. 2. Minimum 3–5 years working experience as QS in construction industry. Data Center / M&E Strong Electrical project experience is highly preferred. 3. Familiar with Malaysia construction contract & CIDB requirement; knowledge in HV/LV, UPS, generator, PDU & IDC power system measurement. 4. Competent in quantity take-off & BOQ preparation, advanced Excel skill for costing sheet, familiar with local material & sub-contractor market price. 5. Fluent in Mandarin, good written & reading English for contract, BOQ and consultant document. 6. Meticulous, responsible, able to work on site, handle costing & final account independently and work under pressure. 7. Experience in EPC project is an added advantage. Salary & Benefits * Salary: RM6000 – RM9000 (based on experience) * Full statutory contribution EPF, SOCSO, EIS * Project incentive bonus & yearly performance bonus * Annual leave, sick leave & public holiday follow Malaysia Labour Law * Long-term stable large-scale data center project Location 71-01 JALAN KEMPAS UTAMA 1/2 TAMAN KEMPAS UTAMA SKUDAI, 81300 Johor Bahru, Johor Interested candidates please send resume for interview consideration.

Requirements

  • Job Overview
  • We are hiring a Quantity Surveyor for our data center M&E/electrical project at Medini Johor Bahru.
  • The QS will be fully responsible for project costing, quantity take-off, BOQ preparation, contract administration, variation order, progress claim, sub-contractor cost control throughout the whole construction cycle, to manage project budget & mitigate contractual risk.
  • Responsibilities
  • 1. Conduct quantity take-off, prepare BOQ, cost estimation, tender pricing and cost breakdown, mainly for data center critical power & M&E system.
  • 2. Source quotation from sub-contractors & suppliers, commercial evaluation, negotiation & sub-contract order management.
  • 3. Prepare monthly progress claim, site measurement, valuation of Variation Order (VO), document closing.
  • 4. Monitor actual cost vs budget, cost analysis, cost overrun alert & value engineering proposal.
  • 5. Handle claims, counter-claims, dispute documentation, interim valuation and final account settlement.
  • 6. Review construction drawing & specification, identify discrepancy between drawing and site condition.
  • 7. Maintain full set of costing, contract, variation & measurement records
  • prepare periodic cost report to Project Manager.
  • 8. Liaise with client, consultant and sub-contractor on all commercial & costing matters.

Languages

English, Malay, Chinese

💬 WhatsApp 📝 Apply now