168Hire
Post a Job Log in
Find Jobs Newsroom Job Safety Pricing

Safety & Health Officer (SHO) | Data Center Construction Project

TGW SMART SOLUTION SDN.BHD · 📍 Gelang Patah 振林山, Johor
Full-time construction ✅ Direct contact
Salary6000-9000
Job typeFull-time
Experience3–5 years 3–5 年
LocationGelang Patah 振林山, Johor

About the job

Responsibilities 1. Establish and implement site safety & health management system, prepare Safety Plan, HIRARC, emergency response plan, and manage PTW (Permit to Work) for high-risk works including hot work, working at height, confined space & live electrical installation. 2. Conduct regular site safety inspection, identify hazards, issue corrective notices and follow up for closure, especially for IDC strong power installation, UPS, generator & battery installation works. 3. Conduct site induction, toolbox talk, fire & emergency drill. 4. Investigate accident & near-miss incidents, prepare incident reports and maintain complete safety records. 5. Liaise and attend inspection by DOSH(JKKP), CIDB; resolve non-conformity raised by authority. 6. Monitor all contractors & workers to comply with OSHA 1994 and CIDB construction safety regulation, prevent stop-work order & penalty. 7. Organize safety committee meeting, prepare monthly safety report to project management team. 8. Manage PPE, safety signage and full safety documentation filing. Requirements 1. Must hold valid DOSH registered SHO Green Book (Mandatory, no Green Book application will not be considered) 2. Minimum 3–5 years construction site safety experience, data center / M&E electrical project experience is highly preferred 3. Strong knowledge on Malaysia OSHA Act 1994, CIDB construction safety code and DOSH audit procedure 4. Familiar with safety risk for IDC critical power system (HV/LV, UPS, generator, battery installation) 5. Fluent in Mandarin, able to read & write English for safety documents and official correspondence 6. Meticulous, responsible, able to work under pressure and stay on construction site 7. Competent in HIRARC, JSA & PTW system 8. First Aid certificate, CSHO certificate is an added advantage Salary & Benefits * Salary: RM6000 – RM9000 (based on relevant experience) * Full statutory contribution EPF, SOCSO, EIS * Project safety bonus & yearly performance bonus * Annual leave, sick leave & public holiday follow Malaysia Labour Law * Long-term stable large-scale data center project Location 71-01 JALAN KEMPAS UTAMA 1/2 TAMAN KEMPAS UTAMA SKUDAI, 81300 Johor Bahru, Johor 22 Jalan Nusa Puncak 2 Taman Nusa Puncak Gelang Patah, 81550 JOHOR, Johor Interested candidates please send resume together with a copy of SHO Green Book for interview consideration.

Requirements

  • Job Overview
  • We are hiring a registered Safety & Health Officer (SHO) with valid DOSH Green Book registration for our data center construction project in Medini, Johor Bahru.
  • The SHO will be in charge of full site EHS management, risk control, regulatory compliance, liaison with DOSH/JKKP & CIDB, to ensure all electrical & construction work complies with Malaysia OSH & CIDB requirements.

Languages

English, Malay, Chinese

💬 WhatsApp 📝 Apply now